May
15
- We are working on our steering system ( a single tie rod and drag link system)
- A-arms were attatched
- The crank set was placed in
- Worked on seat mounting
- Hydraulic hose links and attaching the hydraulic control valve.
- We worked on our front and back de-railers and chain guides
Post a Comment